← Energy Bytes4 Sept · 1 h 17 min
EP 85: Aarya Borele from Evardi Energy
Utilities are drowning in paperwork long before a repair crew ever leaves the yard. Aarya Borele, co-founder and CTO of Evardi Energy, walks John and Bobby through outage requests getting rejected a day out, FERC 881 pushing line ratings from seasonal to hourly, and why 95 percent accuracy is a failing grade when the lights are on the line. Also in here: the grid as cloud infrastructure, Griddy's flameout, and a 49ers conspiracy theory involving a substation.
Click here to watch a video of this episode.
Join the conversation shaping the future of energy.
Collide is the community where oil & gas professionals connect, share insights, and solve real-world problems together. No noise. No fluff. Just the discussions that move our industry forward.
Apply today at collide.io
Click here to view the episode transcript.
0:00 Agents, VMs and running everything at once
3:26 Back in the studio
4:34 What Evardi does
5:45 Uri and the incentive problem
10:28 When the ISO rejects your outage
12:35 How the grid actually works